UBS



Nashville, Tn and Stamford Ct


AtmosAir was initially installed to provide cleaner air in the Daycare Centre at the Stamford, Connecticut location.


The results were so impressive, that AtmosAi was then installed throughout the entire Stamford building including the world's largest trading floor. Then, AtmosAir was installed in UBS's Nashville HQ building, and their Nashville Operations Center.


IAQ testing showed a 90% reduction in VOC's, a 60% reduction in PM2.5 and reduced outside air intake in compliance with ASHRAE 62.1 IAQP.


″AtmosAir has proved that they can help us provide a better IAQ and workplace for our employees. We have gradually increased the amount of AtmosAir installations throughout our portfolio, and look forward to implementing more AtmosAir systems.″


Michael Galle , Executive Director, building Services and Infrastructurem, USB